Project Name: 800kVA Prefabricated Compact Substation Project, Fudan University
Delivery Date: April 21, 2025
Location: Fudan University, Shanghai, China
Background: To meet the power expansion demand of campus research buildings and laboratory facilities, and ensure stable operation of high-precision experimental equipment, the university launched this box type transformer substation upgrade project, replacing old facilities with an integrated prefabricated substation.

Main Equipment: 800kVA Prefabricated Package Substation
Voltage Class: 10kV/0.4kV
Supporting Units: HV incoming cabinet, metering cabinet, LV outgoing cabinet, reactive power compensation device
Standards: Compliant with GB 50053 and IEC 62271, with complete five-prevention interlock and overload protection.

Integrated Delivery: Fully pre-assembled and tested in factory; only on-site cable connection and acceptance are required, greatly shortening construction period and minimizing disruption to campus activities.
Environmental Adaptability: Fully sealed enclosure with moisture-proof, dust-proof and anti-intrusion performance, suitable for the humid and rainy climate in Shanghai.
Smart Operation: Equipped with temperature/humidity monitoring and fault warning, connectable to campus power monitoring platform for remote management.

After commissioning, the project effectively improves regional power supply capacity and reliability, meets the power quality requirements of precision laboratory equipment, and provides stable power support for campus research and teaching.