Tenrony manufactures single-phase pole-mounted transformers for overhead power distribution projects. Conventional and completely self-protected (CSP) configurations are available according to the required electrical ratings and protection arrangement.
Our pole-mounted units form part of the Tenrony oil-immersed transformer range. For a project-specific proposal, provide the required rated capacity, primary and secondary voltages, frequency, installation conditions and applicable technical specification.
Standards designed as per IEC, ANSI/IEEE, etc
Rated power from 10 kVA up to 500 KVA
Rated insulation level up to 34.5 kV
Rated frequency 50 or 60 Hz
Naturally, ONAN/KNAN on request
The impedance range is 1% ~ 3.5%
The vector group is Ii0 or Ii6
Dual dual-voltage switch is available
Conventional or CSP(Completely Self-Protected) on request
Average Winding Rise is 55 °C, 55/65 °C, 65 °C
Mild steel or stainless steel tanks and covers are available
Lightning arrester, IFD, thermometer, and other accessories are available
The 100kVA Single-Phase Pole-Mounted Transformer, converting 208V to 230V/240V, offers superior performance and customizable options.
Conventional and completely self-protected pole-mounted transformers differ in their protection arrangements. Selecting the appropriate configuration requires a review of the network protection scheme and the functions included in the proposed equipment.
| Selection Point | Conventional Configuration | CSP Configuration |
| Protection Planning | Coordinate the transformer with the protection equipment specified for the network | Review the protective functions and devices included in the proposed self-protected design |
| Items to Confirm | External protection interfaces, accessories and utility installation requirements | Included protective devices, their ratings and any external protection still required |
| Technical Documentation | Transformer drawing, connection information and accessory list | Transformer drawing, protection arrangement and operating information |
| Selection Basis | Network protection requirements and the approved project specification | Required self-protection functions, network coordination and the approved project specification |
The CSP designation should not replace a review of the actual protection scheme. Buyers should confirm the supplied devices, ratings, coordination requirements and operating instructions before approving the equipment.
Pole-mounted transformer design should address the electrical configuration and the mechanical interfaces needed for installation, connection and maintenance.
The transformer is designed for installation on utility poles. Confirm the mounting arrangement, equipment weight, connection positions and access requirements against the project’s pole structure and installation design.
Mild steel and stainless steel tank and cover options are available. Material selection and surface protection should be discussed with reference to the installation environment and project specification.
Accessories such as a lightning arrester, internal fault detector and thermometer can be reviewed during configuration. The final accessory list should identify what is included in the supply and how each item interfaces with the network.
Before approving the configuration, review the outline dimensions, mounting details, terminal arrangement and accessory positions. This helps the project team identify interface requirements before delivery and installation.
Single-phase pole-mounted transformers serve overhead distribution projects supplying compatible single-phase loads. Selection depends on the network voltage, connected load, protection requirements and installation conditions.
For residential supply projects, confirm the secondary voltage, load requirements and local utility specification before selecting the transformer configuration. Capacity selection should consider the expected demand and the project’s load assessment.
For rural overhead networks, review the required capacity, environmental conditions, pole arrangement and maintenance access as part of the project design. These inputs help define the transformer configuration and installation requirements.
For shops, lighting loads and other suitable single-phase supply points, confirm the load profile and equipment starting requirements. Loads requiring three-phase power need a corresponding system design.
For broader phase-selection questions, see our single-phase vs three-phase transformer comparison
Testing requirements for a single-phase pole-mounted transformer should be agreed for the selected design and applicable standard. Inspection records should identify the equipment rating and the requirements verified before shipment.
Discuss the required checks for winding resistance, voltage ratio, no-load and load losses, impedance, dielectric performance and functional operation where applicable. Additional tests and customer or third-party witnessing should be arranged as part of the agreed inspection plan.
Buyers should confirm the required document package, including approved technical data, outline drawings, connection information, the supplied accessory list and factory test reports. The scope of documentation and testing should be agreed with the order.
Our overview of transformer factory test items explains the distinction between routine, type and special tests when preparing a procurement specification.

Contact us to discuss your power distribution needs and get a customized solution from our expert team.
Tel:
E-mail:
Address:
No.788 Wenyi Road, Bihu Town, Lishui City, Zhejiang Province, China